 | To form a close working relationship with the customer, and so blend in
with the working practices of the site.
|
 | To be cost effective and use RECYCLING methods wherever safely possible.
|
 | To improve and update all environmental activities. This is to include
site personnel and contractors used.
|
 | Technical Evaluate all work using
C.O.S.H.H. Method statements Risk
Assessment Control procedures Health & Safety Assessment
|
 | Work to be carried out in compliance with Duty of Care Training &
Education A.D.R. qualified drivers C.D.G. transport regulations Special
Waste Regulation 1996.
|
 | Chemical loads to be accompanied by a fully qualified chemist, thereby
insuring that the level of compliance is far greater than that required by
the environmental agency.
|
 | Chemcycle personnel have a minimum of 10 years experience in the
Waste/Environmental industry and a BSc (Hons) in Chemistry. |